Spanish Version en Español

Set-up WALEVA pilot plant (Advance)

Description

2016 Summer started the installation WALEVA pilot plant. The reception of equipment and set up of different critical parts of the pilot plant was achieved with success in thes period. Last October was treated close to 1 Ton of rice straw following the TR’s engineering standards. In next months, WALEVA technology will run and levulinic acid production will start in commercial grade.

Date:

Category: